Transport comparison

Choose How It Moves.
Compare The Complete Journey.

Use these points when discussing your shipment directly with the Jeton Express team.

Transport modes

Four Ways To Move.
One Connected Plan.

Ocean, air, international road and CEP. Start with the cargo, choose the transport, then connect preparation and delivery.

Ocean Freight

Dedicated containers or shared space. Compare FCL and LCL around the packed volume and receiving plan.

FCLLCL

Air Freight

Plan time-sensitive cargo around weight, dimensions, airport handoffs and the delivery endpoint.

Explore Service

TIR Road Freight

TIR road planning for suitable cross-border corridors, with cargo, transit and receiving requirements reviewed together.

Explore Service

Courier · Express · Parcel

Courier, express and parcel options for samples, ecommerce orders and smaller shipments.

Explore Service

Worked planning example

From Carton Measurements To Shipment Volume

Situation

20 cartons each measure 60 × 40 × 50 cm outside their packaging. Their combined carton volume is 20 × 0.60 × 0.40 × 0.50 = 2.40 m³.

What To Do

  1. Record quantity and dimensions for each carton group; use metres in the cubic-volume calculation.
  2. Add each group separately. If a pallet or crate is added, measure the finished outer package again rather than adding the product dimensions alone.
  3. Compare LCL handling, minimum charges and destination charges with the full-container scope. 2.40 m³ alone cannot decide the cheaper mode.

What To Check Afterwards

A carton-volume calculation is a planning input. Final packed volume, weight, stacking constraints and the selected charging rules determine the quotation basis.

Worked planning example

Why A Light Carton Can Have A Larger Charging Weight

Situation

A packed carton measures 60 × 40 × 50 cm and weighs 12 kg. Using an illustrative divisor of 5,000 gives 60 × 40 × 50 ÷ 5,000 = 24 kg volumetric weight.

What To Do

  1. Send dimensions in centimetres and gross weight in kilograms for each package; do not mix units.
  2. Ask which divisor, comparison rule, rounding and minimum apply to the chosen service. The divisor above is an example, not a Jeton tariff.
  3. If repacking is proposed, compare the final protection, dimensions, weight and repacking cost before approving it.

What To Check Afterwards

Where the service charges the greater of actual and volumetric weight, this example gives 24 kg before rounding or minimums. It does not provide a rate, accepted route or promised delivery time.

Illustrative planning example; quantities are invented, not a customer shipment or a quotation.

Compare Five Transport Options.

Use the same goods, finished packages and receiving endpoint. Compare included and separate charges across the complete journey; a transport estimate alone does not establish the receiver date.

Compare the shipment, not only the freight price.
What to compareFCLLCLAir FreightTIR Road FreightExpress & Parcel
Container spaceA dedicated containerShared container spaceAircraft cargo spaceRoad vehicle or load compartment confirmed for the corridorIndividually identified parcels accepted by the selected service
Planning priorityLoading layout and container suitabilityConsolidation and repeated handlingUrgency and chargeable weightEurope/Eurasia or Middle East corridor review; North/Latin America uses ocean or air with destination truckingEach parcel’s contents, recipient and delivery coverage
Cargo informationPacked dimensions, total weight and loading accessPackage count, volume, weight and stackabilityGross weight, outer dimensions and product restrictionsOrigin and endpoint, package measurements, access and product documentsContents, value, outer dimensions, gross weight and recipient for each parcel
Cost discussionContainer, origin and destination scopeChargeable volume or weight and handling chargesChargeable weight and the selected serviceAgreed transport legs, transit-related work, destination import and delivery scopePer-parcel charging rules, extra handling, coverage and separate destination charges
Readiness & delivery targetAlign supplier readiness, loading, document and VGM cutoffs with sailing, release and final delivery.Align actual warehouse receipt with consolidation cutoff, destination separation, release and final delivery.Compare ready date, acceptance and tender cutoff with routing, import release and the required receiver date.Compare ready date with corridor availability, border formalities, final import release and receiving arrangements.Compare each parcel’s ready date and acceptance with provider pickup, clearance and the required delivery point.
Batch & receiving fitCompare a dedicated load for a named batch with loading layout, protection and the receiver’s unloading access.Identify the released packages; compare stackability, protection through shared handling and destination collection requirements.Compare the whole order with a named urgent subset; check finished-package acceptance and receiving arrangements.Confirm the named load, vehicle fit and loading/unloading access at the agreed collection and receiving points.Assign contents and packages to each recipient; compare individual dispatch with an accepted consolidated business batch.
Next stepReview the container planCompare These Plans With The TeamReview the consolidation planCompare These Plans With The TeamReview the air serviceCompare These Plans With The TeamReview the corridor and transport legsCompare These Plans With The TeamReview the parcel serviceCompare These Plans With The Team

Planning example

One Order. Two Shipment Plans.

A buyer has goods from several suppliers. Most packages are ready; a named subset is needed earlier. Compare both plans using the same final receiving point.

Plan A · One Complete Batch

When to compare
Compare when the receiver can wait for the outstanding packages and the supplier-ready dates fit the proposed service.
What changes in the scope
Review waiting/storage, consolidated packing, a single release list and the accepted onward service for the complete batch.

Plan B · Urgent Subset, Balance Later

When to compare
Compare when specified items have an earlier receiver deadline and the remaining goods can travel separately.
What changes in the scope
Identify exact packages and recipients in each dispatch; compare two freight scopes, minimums, handling, documents and receiving arrangements.

Splitting can change the total cost and handling work. Confirm acceptance, final measurements, document allocation and the proposed receiving dates for each dispatch before deciding.

Compare The
Complete Scope.

Include origin collection, handling, international transport, destination release and the final delivery endpoint when comparing options.

Share the cargo-ready date and required arrival date. A sailing or flight estimate does not cover every handling stage.

Understand The Quotation

Compare An Urgent Subset With One Complete Batch

Use the worksheet to compare two actual shipment plans with the same final receiving point. Give the urgent subset and the balance their own quantities, ready dates, acceptance records and expected dates of usable receipt.

Put Both Plans On The Same Timeline

DHL’s quotation page distinguishes estimates using provisional cargo details; Maersk’s air-service table uses airport-to-airport timings. Our proposed comparison records production readiness, collection, departure, destination handling and usable receipt separately. Add the date the receiver actually needs the goods. Confirm how each forecast was established and mark unresolved stages. A shorter flight time cannot close a stock gap if collection or receiving still happens too late.

Make Additional Work Visible Before Approval

Keep the package references and approved quantity of each batch alongside its quotation. Ask which extra collection, handling, packing, documentation or delivery charges result from splitting. Record currency, offer validity, exclusions and unpriced work. Assign a decision date and a person who approves the extra cost. Do not treat a calculation of required stock as transport acceptance: the finished cargo, service and receiving capacity need their own confirmation.

Illustrative Stock-Gap Calculation

Invented assumptions: 120 usable units, demand of 10 units/day and a sea batch usable on day 40. The gap at day 40 is 10 × 40 − 120 = 280 units, before any chosen buffer. An urgent subset usable on day 10 arrives within the existing 12 days of cover; if it arrives on day 16, a four-day gap already occurs. These invented figures test timing only and do not recommend a shipment quantity, price or service.

Download The Two-Plan Comparison Sheet In English

Replace the assumptions with your own dated records and confirm both plans with the booking contact. The official references illustrate quotation scope; their service times and capabilities are not Jeton guarantees.

Your next shipment

Start With A Conversation.

Tell us what you are shipping and where it needs to go. Our team will help you work through the next steps.

WhatsAppTelegram

Search Jeton Express

Type to search pages in this language.

Use arrow keys to move through results, Enter to open and Esc to close.

ServicesShipping guides